TY - RPRT TI - TIGER Report - Tidal stream technology and project development: Interim lessons learnt AU - Baldock, A AB - The TIGER project was launched in October 2019 and will be completed in 2023.The TIGER project will build cross-border partnerships to develop new tidal stream energy (TSE) technologies, test and demonstrate them at a number of project locations (mainly around the Channel region), and use the learning from these developments to make a stronger case for cost-effective TSE deployments as part of the France/UK energy mix. The aims of TIGER include the leveraging in of other funding for the actual installation of future TSE arrays at TIGER project locations, as important as obtaining the necessary consents within TIGER, which has been supported by the design work within TIGER. The project will deliver new designs for turbines with improved performance and lower cost, as well as for associated infrastructure and ancillary equipment. TIGER will demonstrate that TSE is a maturing industry, capable of achieving an accelerated cost reduction pathway. The project will position the Channel region at the heart of the sector by:addressing technology challenges;building the supply chain;switching on new sites; andinstalling new turbines.For more details of the TIGER project, see: https://interregtiger.com.View the All Energy 2022 presentation slides here. DA - 2022/05// PY - 2022 SP - 14 PB - Baldock Energy Ltd UR - https://interregtiger.com/download/tiger-report-tidal-stream-technology-and-project-development-interim-lessons-learnt/ LA - English KW - Current KW - Tidal ER -