You are now viewing content in MHK Data Repository through the integrated PRIMRE search. Clicking on titles will take you to the content on the integrated database. Partial word matches are returned (e.g. "data" finds "database"), but every entered term must be found. If you don't find any results, try reducing the number of words entered. Filters to the right can help narrow your search.
Showing Results for
- Dataset, Data, Report:
John Horne… Density values from active acoustic measurements at South Energy Test Site. This data correspond to a bottom mounted upward-looking WBAT, deployed from April 19th to …
- Dataset, OnlineTool:
Jim Thomson… Wave Instrument Float With Tracking (SWIFT) buoy deployments at the Newport South Energy Test Site during extreme wave events. …
- Dataset, Archive:
Randall Pittman… 4, 2013 a TRIAXYS wave buoy was deployed in the Pacific Marine Energy Center - North Energy Test Site. This submission includes all the preprocessed data extracted from the binary TRIAXYS …
- Dataset, Archive:
John Horne… Acoustic Pilot surface survey at the South Energy Test Center at Newport (Oregon). Data collected with a SIMRAD EK-60 echosounder using four …
- Dataset, Archive:
Garrett Staines… 14-17, 2021) of ARIS acoustic camera data from the main research barge of the Tanana River Test Site operated by UAF. Data are collected sidelooking with the turbine in part of the field of … underwater camera due to the high levels of suspended sediments at the Tanana River Test Site. …
- Dataset, Archive:
Randall Pittman… 2015 a TRIAXYS wave buoy was deployed in the Pacific Marine Energy Center - South Energy Test Site. This submission includes all the preprocessed data extracted from the binary TRIAXYS …
- Dataset, Data:
Annette von
TRIAXYS data from the NNMREC-SETS, for Nov. 2014 - Jan. 2015, and May 2015 - Dec. 2015. The data consists of: Date, Time, significant wave height (1 hour average), significant wave period (1 hour average).
- Dataset, Data, Report:
John Horne
Acoustic backscatter data from a WBAT operating at 70kHz deployed at PMEC-SETS from April to September of 2016. 180 pings were collected at 1Hz every two hours, as part of the Advanced Laboratory and Field Arrays (ALFA) for Marine Energy project.
Data was subject to preliminary processing (noise removal, a threshold of -75dB was applied, surface turbulence and data below 0.5m from the… - Dataset, Data, Presentation, Report:
Mason Bichanich and Martin Wosnik
The ADV measurements contained in this submission were taken on the floating turbine deployment platform (TDP) located at the Memorial Bridge in Portsmouth, NH. The measurements were conducted 11/4/2021-11/9/2021 with the fastest currents occurring on 11/7/2021. Along with the submission of ADV data, a .ppt and text document further explaining the ADV deployment location is included.
- Dataset, Report:
Dan Hellin… National Marine Renewable Energy Center Project fishing vessel charter survey and South Energy Test Site (SETS) selection evaluation report. …
- Dataset, Report:
Erik Hammagren et al.… underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides robust, new … submission includes reports for the SeaRAY preliminary system design, integration plan, and test plan for testing at the U.S. Navy's Wave Energy Test Site (WETS), as well as the preliminary installation, operation, & maintenance (IO&M) plan. …
- Dataset, Data, Report, Archive:
Bradley A Ling… Test data from the 1/15th Wave Tank Tests of the Azura performed in 2017/2018 to validate the … by Northwest Energy Innovations (NWEI) planned for deployment at the US Navy's Wave Energy Test Site. Raw and processed data included, along with test plan, test report, and summary data in the …
- Dataset, Archive, Report:
Jeremy Kasper… sonar system for detecting woody debris in natural settings was conducted at the Tanana River Test Site (TRTS) in Nenana, AK between 8/26 and 9/23, 2015. The TRTS is approximately 65 miles south …
- Dataset, Report, OnlineTool:
Thomas Boerner et al.… Key outcomes include deployment and operation of the demonstration unit at an open water site which replicates full scale ocean conditions, and performance and load measurements which … full-scale device. This report briefly describes the x1's final system design but, as a final test report, mainly focuses on the open water testing. For further description of the WEC system …
- Dataset, Report:
Katie Sellers-Reynolds
… required and obtained for installation, operation, removal of the TidGen Single Turbine Test system in Cobscook Bay, May in 2023. The Ocean Renewable Power Company (ORPC) worked with … non-grid connected testing of the TidGen Single Turbine System (STS) at ORPC's established test site in Cobscook Bay, Maine. A list of the required permits and approvals garnered for project …
- Dataset, Report, Data:
Borja De Miguel and Aimar Maeso… Water Column (OWC) technology by performing a detailed WEC design to fit PacWave-South site conditions. This includes tank testing campaign data conducted by IDOM at TEXAS A&M OTRC wave basin. This submission has the tank wave test data, summary of the project, and details on specifics of the project. …
- Dataset, Report, OnlineTool:
Thomas Boerner et al.… Key outcomes include deployment and operation of the demonstration unit at an open water site which replicates full scale ocean conditions, and performance and load measurements which … full-scale device. This report briefly describes the x1's final system design but, as a final test report, mainly focuses on the open water testing. For further description of the WEC system … which will become publicly available at the end of 2027. The full version of this Final Test Report will become available on 8/10/2028. This WEC pilot project was done at Scripps in San …
- Dataset, Report:
Eric Nelson… Station Kaneohe Bay (MCBH). Data from the deployment will be uploaded over the course of the test. The instrumentation and data come from the NREL team participating in this testing. …
- Dataset, Archive, OnlineTool:
Eric Nelson… for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the …
- Dataset, Archive, OnlineTool:
Eric Nelson… for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the …
Displaying 1 - 20 of 89