You are now viewing content in Tethys through the integrated PRIMRE search. Clicking on titles will take you to the content on the integrated database. Partial word matches are returned (e.g. "environment" finds "environmental"), but every entered term must be found. If you don't find any results, try reducing the number of words entered. Filters to the right can help narrow your search.
Showing Results for
- Report:
European Marine Energy Centre (EMEC)
… regarding the Section 36 application to extend the boundary of EMEC’s Billia Croo wave test site. Following a formal consultation exercise carried out by Marine Scotland, several issues …
- Report:
FORCE
… biological, and other research areas. The latest monitoring programs at the FORCE site were initiated in 2016 in anticipation of turbine deployments by one of FORCE’s ‘berth … monitoring led by individual tidal energy developers or ‘berth holders’ at the FORCE site. All plans are reviewed by FORCE’s independent Environmental Monitoring Advisory Committee … the report presents details regarding future research and monitoring efforts at the FORCE test site. All reports, including quarterly monitoring summaries, are available online at …
- Report:
Oregon State University
… proposed PacWave South (Project; formerly known as Pacific Marine Energy Center South Energy Test Site [PMEC-SETS]), a grid-connected wave energy test facility. The Project would be located in the Pacific Ocean, approximately 6 nautical miles …
- Journal Article:
Want et al.
… response is described and applied to data from a wave-monitoring buoy deployed at a test site in Orkney. The results are discussed in relation to the accuracy of the measurement …
- Conference Paper:
Xu and Matzner
… from all three datasets resulted in a mean average precision (mAP) score of 0.5392. To test how well a model could generalize to new datasets, the model was trained using examples from …
- Project:
Julie Mai
… pilot will provide information to help plan for deployment of a larger unit at the PacWave test site in Oregon. …
- Report:
Terrill et al.
… funding on-going efforts to monitor the benthic ecology at the wave energy conversion project site. These analyses are predicated on the assumption that a BACI sampling/analytical approach will be used to test the hypothesis that the deployment and operation of wave energy conversion (WEC) technology will be deployed at the site referred to hereafter in this document as the WEC project site. …
- Thesis:
Langhamer
… as in enhancing potential positive effects on the marine environment. The Lysekil research site is situated about two kilometers offshore and has been under development since 2005. During … seabed have been taken during five seasons. Biomass, abundance and diversity of fauna in the test site were generally low, but higher than in a nearby control site. The species composition was …
- Project:
Iaian Russell
… tidal currents. In 2015 Wave Dragon closed the Section 35 application and stopped work on this site. As a test site; this location would never have been commercially viable and since 2013 work had commenced …
- Presentation:
Taormina et al.
… concrete mattresses and natural substratum (taken as a reference) at the Paimpol-Bréhat tidal test site in France. The aim of this study was to optimise methods of underwater imagery analysis to efficiently characterise the reef effect of SPC on epibenthic communities of the study site. To reach this objective, the authors answered three distinct questions: 1) What is the …
- Conference Paper:
Viehman et al.
… 2016 by an upward-facing echosounder deployed at the Fundy Ocean Research Center for Energy test site in the Minas Passage. Fish density was higher and less variable in winter than in summer, …
- Presentation:
Redden et al.
… The Fundy Ocean Research Centre for Energy (FORCE) in the upper Bay of Fundy is a tidal energy test facility that has been the focus of a multi-year fish tracking study (2010-2013) to address … of all 4 species were detected on receiver “listening gates” in the Minas Passage and FORCE test area. Travel speeds through the Minas Passage often exceeding 3m/s. Swimming depth in Minas … for eels, sturgeon and striped bass and largely within the top 40m in and near the FORCE test area. Of the four species, striped bass was most commonly detected in the Minas Passage, …
- Presentation:
Bald et al.
… its first GWh of electricity supplied to the grid. This facility is now available as a test site providing developers with a unique opportunity to test new concepts in air turbines, generators, control strategies and auxiliary equipment. Like …
- Project:
Arhontia Athanasiou
… Mocean’s wave energy converter designs. In addition to the power performance of the WEC, the test programme assessed the behaviour and practicalities of the mooring system and the electrical … This design requirement was put in place to facilitate the testing at the performance test site. The rotation of the aft hull with respect to the forward hull drives a gearbox and …
- Report:
Dooher et al.
… leading to long-term megawatt-scale wave power production. The first-stage tasks consisted of site selection, permitting, pilot plant design, and assessment of technology and commercial … permitting activities. Pilot Plant Design PG&E prepared a conceptual design for a 5-MW pilot test facility at the Humboldt site, which consisted of an off-shore deployment area where WECs of … while the WEC manufacturers would provide, operate and maintain their devices during the test period. Technology and Commercial Readiness PG&E issued a Request for Information to the …
- Project:
Steve Jermy
… Wave Hub is a grid connected test site. It aims to facilitate Wave Energy Converters (WECs) development through final demonstration … Within this area there are four berths for WECs and their mooring spreads. Water depths at the site range from 51 – 57 m. Each berth has its own Underwater Power Converter Unit (PCU); i.e. …
- Project:
Zoe Haywood
… Site selection, feasibility assessments and environmental studies began in 2006 and a newly … leader Atlantis Resources Ltd in 2015. The location for the proposed array was a 0.56 km2 site between the group of rocks and islands known as the Skerries and Carmel Head. The site is … capacity of up to 10 MW. The array was planned to operate for up to 25 years and serve as a test case for the development of the technology in multi device arrays. The technology used was …
- Journal Article:
Findlay et al.
… ~28 km) for harbour porpoises around aquaculture sites. Assuming a single device at each site, 23% of the harbour porpoise SAC was predicted to be exposed to ADD noise sufficient to … threshold shift, and under the worst-case scenario (multiple, continuously running devices per site with an aggregate duty cycle of 100%), levels exceeding permanent threshold shift could …
- Journal Article:
Taormina et al.
… how concrete mattresses that stabilise the submarine power cable of a tidal energy test site can increase habitat capacity for benthic megafauna. A five-year monitoring, which relied on … for colonisation by mobile megafauna. Local physical characteristics of the implantation site (e.g.substratum type, topography, exposition to currentetc.) significantly impact amount and …
- Journal Article:
Bailey et al.
… are in the public mind. This paper presents a quantitative study of public opinions on a test site for wave energy currently under construction near the coast of the Southwest UK. The …
Displaying 201 - 220 of 401