You are now viewing content in Tethys through the integrated PRIMRE search. Clicking on titles will take you to the content on the integrated database. Partial word matches are returned (e.g. "environment" finds "environmental"), but every entered term must be found. If you don't find any results, try reducing the number of words entered. Filters to the right can help narrow your search.
Showing Results for
- Journal Article:
Boehlert and Gill
… argue it is possible (and necessary) to minimize others through careful device development and site selection; the scale of development, however, will lead to cumulative effects that we must …
- Report:
Wilde et al.
… procedures to be followed to identify and evaluate potential concerns at any OTEC proposed site is proposed for discussion and refinement in advance of any real OTEC test operations. …
- Thesis:
Lockett
For the west coast of North America, from northern California to southern Washington, a habitat suitability prediction framework was developed to support wave energy device siting. Concern that wave energy devices may impact the seafloor and benthos has renewed research interest in the distribution of marine benthic invertebrates and factors influencing their distribution. A Bayesian belief…
- Journal Article:
Blondel and Walsh
… We present here broadband measurements (10 Hz to 32/48 kHz) acquired at the Falmouth Bay Test site (FaBTest, UK) from 2010 onwards, for a 16-m ring-shaped Wave Energy Converter, in waters up …
- Report:
Herschel et al.
… programme of projects to be progressed. The specific aim of ORJIP Project 4 is to: Review, test and/or develop acoustic deterrent devices (ADDs) or other deterrent devices for multiple …
- Report:
FORCE
… is the monitoring and reporting of any environmental effects from tidal turbines at the FORCE site. FORCE is a demonstration project, with berth sites granted to a number of technology … the deployment of approximately two to three TISEC turbines by each developer at their berth site. As these deployments are expected to be phased in over the next several years, FORCE and … a dedicated berth some 200 m in diameter. The berth holder in turn will deploy, operate and test their turbine technologies, which will be connected to the electrical grid through dedicated …
- Project:
Tom Clements
… Installation: Once the PowerBuoy mooring system was installed, the device itself was towed to site and installed. The Power Buoy was towed by tugs from the construction yard at Invergordon to site, a distance of approximately 33 nm. The device was ballasted to a horizontal configuration … physical interventions during the deployment. Maintenance: There was no maintenance during the test period. OPT monitored turbine performance via the communications links with the device. …
- Report:
European Marine Energy Centre (EMEC)
… of a range of underwater acoustic monitoring studies that had been performed at the EMEC test sites. The group observed that there was a wide range of reporting approaches and …
- Journal Article:
Taormina et al.
… we monitored epibenthic colonization of different structures associated with a tidal energy test site located in a high-energy hydrodynamic environment. Using four years of image-based …
- Conference Paper:
O'Dea and Haller
… on the nearshore impacts of WEC arrays in order to facilitate the assessment of future field test sites. The study utilizes the spectral wave model SWAN. Two array configurations are …
- Report:
Henkel
… around anchor deployed from 2013 to 2015 at Oregon State University’s PacWave-North test site (formerly called PMEC-NETS and referred to as such throughout this document) off Newport, …
- Report:
Bull et al.
… Water Column Wave Energy Converter (WEC) device appropriate for the modeled reference resource site was identified, and a detailed backward bent duct buoy (BBDB) device design was developed … with partners from National Laboratories, industry, and universities to design and test this reference model. …
- Thesis:
Rocha
… used to run the data will be MIKE Zero – Underwater Acoustic Simulator by DHI . In the study site only cetacean species are expected to occur. Results showed that behavioural responses might … no injury is expected. MIKE Zero – Underwater Acoustic Simulator is a powerful tool to test any device that produces underwater noise and offers the possibility to create Surface Sound …
- Journal Article:
Soares et al.
… efforts are being made to turn the main inlet of the lagoon, the Faro-Olhão Inlet, a testing site for small scale tidal stream turbines, which will bring an additional source of underwater …
- Document, Journal Article:
Harsanyi et al.
… An increased occurrence of larval deformities was observed in addition to reduced swimming test success rate amongst lobster larvae. These traits may ultimately affect larval mortality, …
- Project:
Douglas Watson
… is installed. This allows the machine to be quickly and safely installed and removed on site in a range of sea states and using non-specialised vessels, enabling maintenance to be …
- Report:
Minesto
… 1:4 scale devices. The next step is to deploy a full scale device. Following a comprehensive site selection study, the Holyhead Deep in North Wales was selected as the ideal location to …
- Project:
Zoe Haywood
… to 60 tidal devices, with an aggregated maximum capacity of up to 30MW. The 5km2 development site will be segregated into a number of berths (a maximum of six berths and a minimum of three … with grid connection infrastructure via subsea export cables, as well as navigation aids and site monitoring equipment to allow developers to utilise the area to demonstrate their tidal technologies. Export Cable: The development site will provide between three to six berths for tidal devices to be deployed, with a subsea …
- Report:
Bowers et al.
… FERC’s “pilot license” option, a much shorter than normal license term to allow developers to test equipment on-site and study potential impacts. Pilot projects also allow stakeholders to help identify …
- Report:
Federal Energy Regulatory Commission
… Pilot projects are small, short-term, removable, and carefully-monitored projects intended to test technologies, sites, or both. Some hydrokinetic pilot projects may be appropriate for …
Displaying 321 - 340 of 401