You are now viewing content in Tethys through the integrated PRIMRE search. Clicking on titles will take you to the content on the integrated database. Partial word matches are returned (e.g. "environment" finds "environmental"), but every entered term must be found. If you don't find any results, try reducing the number of words entered. Filters to the right can help narrow your search.
Showing Results for
- Conference Paper:
Lejerskog et al.
… a submerged interconnection and conversion of the power from the generators. The project has a test site on the Swedish west coast outside the town Lysekil. The test site has been running since 2002, and the first wave energy converter was installed at the …
- Project:
Lisa MacKenzie
… of the InToTidal project at the European Marine Energy Centre’s (EMEC) Fall of Warness tidal test site. The objective of the InToTidal project was to develop and demonstrate the world’s first … the UFS structure, which would be sited at Berth 6 and the BlueTec platform removed from the test site. The UFS system was never demonstrated due to Tocardo going into administration, …
- Project:
Ocean Flow Energy
… was installed on its pre-laid moorings at Sanda Sound on the 7th August 2014. The Sanda Sound test site was chosen for its combination of strong tidal flow and harsh wave climate in order to fully …
- Report:
EMEC
… a socioeconomic look at EMEC’s impact, in support for a Section 36 Consent for the Billia Croo test site. …
- Report:
European Marine Energy Centre
… or is in the process of obtaining consent for the location and operation of the wave and tidal test sites within Orkney. There is a requirement under some of the consent conditions for EMEC to provide relevant authorities with details of technologies to be tested within its test areas (see Figure 1.1). In addition, EMEC requires developers to demonstrate the … ensure that it would meet their expectations and facilitate the timely review of proposed test site operations. …
- Website:
European Marine Energy Centre
… and environmental expertise that exists within the local community. With 14 full-scale test berths, there have been more grid-connected marine energy converters deployed at EMEC than any other single site in the world, with developers attracted from around the globe. These developers use the … while in close proximity to sheltered waters and harbours. We also operate two nursery test sites where smaller scale devices, or those at an earlier stage in their development, can …
- Conference Paper:
Kolar et al.
… energy domain. The platform is being developed for the Galway Bay Quarter Scale Wave Energy Test Site and the full-scale, grid-connected Atlantic Marine Energy Test Site now under development by the Sustainable Energy Authority of Ireland. …
- Report:
Aquatera
… Voith Hydro prior to, during and following the installation of its monopile foundation at the test site this summer. …
- Document, Report:
SIMEC Atlantis Energy Ltd
… granted for the installation and testing of the AK-1000 tidal turbine at the EMEC tidal test site, Eday, Orkney, Atlantis has produced an Environmental Monitoring Program (EMP). This …
- Report:
European Marine Energy Centre (EMEC)
… regarding the Section 36 application to extend the boundary of EMEC’s Billia Croo wave test site. Following a formal consultation exercise carried out by Marine Scotland, several issues …
- Presentation:
Wragg
… Monitoring Platform. It provides information on facilities and experience, the tidal test site, the data collection timeline, data for device testing, data for site management Vessel tracking, data for regulatory requirements, data collection in high tidal …
- Report:
Insight Marine Projects
… of Exeter (Renewable Energy Group) to supply hydrographic survey services on the FaB Test wave energy site, located 5km offshore from Falmouth Bay, UK. The purpose of the geophysical survey was to … site operators and device developers a baseline dataset which encompasses the entire FaB Test site and will assist with current and future project planning and execution. This report …
- Document, Conference Paper:
Uriarte et al.
… effect, fish communities monitoring around the Penguin WEC-2 of WELLO-Oy localized in BiMEP test site with the ITSASDRONE surface drone developed by AZTI was planned. The study was designed to … associations between WECs and fish aggregations. Penguin WEC-2 of WELLO was removed from BiMEP test site due to an alarm of leakage. Consequently, we decided to carry out the monitoring work …
- Report:
Sellar and Sutherland
… campaign and subsequent data analysis. Section 2 provides an introduction to the field of site characterisation for tidal energy sites. Section 3 reports on the analysis conducted from site measurements for the EMEC Fall of Warness test site specifically. Section 4 discusses the integration and operation of sensor systems and …
- Conference Paper:
Simas et al.
… and differences in stakeholder groups’ perceptions of wave energy across different test sites in Europe. …
- Document, Magazine Article:
Oregon State University et al.
… including potential effects on the environment. The Pacific Marine Energy Center (PMEC) test sites will allow researchers to monitor and better understand any effects so that informed …
- Project:
Julie Mai
… pilot will provide information to help plan for deployment of a larger unit at the PacWave test site in Oregon. …
- Project:
Zoe Haywood
… one 1000kW tidal energy conversion device (AK-1000), at the Fall of Warness tidal energy test site at the European Marine Energy Centre (EMEC) in 2011. The device was due to be operational in August 2010; however, due to technical problems the site was delayed until August 2011. The AK-1000 device operated with two sets of blades fitted on …
- Book:
Ingram et al.
… experts (from both academic groups and research organisations), developers of proven devices, test sites, certification agencies and end users of the technology. The core members of the … contained partners representing certifying authorities, industrial associations, end users and test sites. The need to include such diverse interests led to an unusually large consortium. …
- Project:
Millie Green
… its ‘Penguin’ wave energy converter (WEC) at the European Marine Energy Centre’s (EMEC’s) wave test site facility at Billia Croo in Orkney, during 2011-2014. The device’s nominal capacity was 1 MW … where it was planned for deployment (along with two other penguin devices) at the Wave Hub test facility, as part of the Clean Energy from Ocean Waves (CEFOW) project. The project is …
Displaying 101 - 120 of 224