Abstract
The LEANCON OWC WEC was deployed at the DanWEC test facility in Nissum Bredning at of July 2015 for test of real sea behaviour and provide experience in which areas, improvement and further investigation is needed. During the test period the device had to survive several storms, which resulted in failure of the primary mooring lines and smaller damage to the cables and steering box. These problems were fixed and allowed for further improvement. The number of test data is by now relatively limited, but gives indication on the devices capability to provide data and absorb energy. The main outcome of the project is therefore the experience and conclusions on where more investigation is needed. This conclusion, together with the problems that was solved during the project period, allows for a more detailed and thorough test series in future project.