Abstract
Since 2010, the Tanana River Test Site in Nenana AK has performed real worlds testing of a variety of MHK devices. BladeRunner Energy has completed 5 testing campaigns, totaling 65 hours of instrumented operations on site. Test site performs fish-impact studies and can operate with our without debris diverter. This poster presentation was presented at the PAMEC conference of 2024 in Barranquilla, Columbia.
Material and Cost Efficient Modular Riverine Hydrokinetic System is located in Alaska, United States of America.