Abstract
Since 2010, the Tanana River Test Site in Nenana AK has performed real worlds testing of a variety of MHK devices. BladeRunner Energy has completed 5 testing campaigns, totaling 65 hours of instrumented operations on site. Test site performs fish-impact studies and can operate with our without debris diverter. This poster presentation was presented at the PAMEC conference of 2024 in Barranquilla, Columbia.