Abstract
This paper used a specialist software package to produce a detailed model of the River Mersey estuary, which can be subjected to a range of simulated tidal conditions. The aim of this research was to use the validated model to identify the optimal location for the positioning of a tidal turbine. Progress was made identifying a new optimal site for power generation using velocity data produced from simulations conducted using the MIKE 3 software. This process resulted in the identification of site 8, which sits mid-river between the Morpeth Dock and the Albert Dock, being identified as the favoured location for tidal power generation in the River Mersey. Further analysis of the site found that a 17.2-m diameter single rota multidirectional turbine with a 428-kW-rated capacity could produce 1.12 GWh annually.