Skip to main content

Testing the TfI SeaSpring, a potential route to lower cost moorings for marine energy devices

Abstract

Mooring systems are critical to the success of the deployment and must be designed for peak load conditions. Conventional designs are heavy and expensive but mooring dampers could reduce peak loading, allowing reduced chain mass, thus reducing both cost and loads.