This site-wide search returns results for all documents and events in Tethys Engineering, prioritizing the best matches. Partial word matches are returned (e.g. "engineer" finds "engineering"), but every entered term must be found. If you don't find any results, try reducing the number of words entered or removing special characters. Filters to the right can help narrow your search. Tethys Engineering features an integrated search with other marine renewable energy databases in PRIMRE - click the buttons below "Showing Results for" to search other integrated databases.
Showing Results for
- Journal Article:
Cross and Rajagopalan
… A synopsis of wave energy converter (WEC) deployments at the U.S. Navy's Wave Energy Test Site (WETS), from the mid-2015 commissioning of the full three-berth site through 2019, is provided. This includes two deployments each of the Northwest Energy …
- Journal Article:
Li et al.
… The US Navy Wave Energy Test Site (WETS) is currently operating three grid-connected berths off Marine Corps Base Hawaii in …
- Report:
WavePiston
… deployment of the 1:3 scale WEC, a 1:9 scale system has been developed designed and build. As test site for the 1:9 model the test site at Nissum Bredning was chosen. The waters at Nissum Bredning are not as energetic as …
- Conference Paper:
Stark et al.
… are related to a number of challenges in the development of ocean renewable energy. Early site assessment is an important part of the development of an ocean renewable energy project, and soil mechanical and sediment dynamical site characteristics should already be addressed at this stage. However, the suitability of the … were used in preliminary experiments to monitor pore pressure variations with wave forcing and test the susceptibility to sediment liquefaction. First surveys using these methods attested that …
- Conference Paper:
Loeffler et al.
… deploying hydrokinetic technologies in Alaska[3]–[8]. As part of this effort, the Tanana River Test Site (TRTS) was established in Nenana, AK, to provide an accessible and pre-permitted location to … UAF have embarked on a multi-year effort to iterate BladeRunner’s turbine technology and field test it at TRTS. This paper summarizes findings and results of field testing a BRE system with …
- Journal Article:
Lettenmaier et al.
… by the Northwest National Marine Renewable Energy Center (NNMREC) at its Pacific Ocean test site off the coast of Newport, Oregon. The WET-NZ is the product of a research consortium between …
- Report:
Thake
… Seaflow has been a project to develop and test a commercially-sized marine current turbine. The turbine was installed in the summer of 2003 … near Lynmouth on the North Devon coast of England. The objectives of the project were to test the feasibility of constructing and operating such a machine, to ascertain whether the … a specialist gearbox manufacturer. The first stage of the project was to identify a site for the turbine and obtain all the necessary permissions to install it, part of which …
- Report:
European Marine Energy Centre (EMEC)
… upon the lessons learnt from real sea deployments of marine renewables at the Orkney-based test site. Four guidance documents have been produced, covering Compliance, Handling, Installation, … of both onshore and offshore marine operations that are part of the planned and unplanned test schedule after the initial installation of a device and moorings and/or foundation are …
- Conference Paper:
Kelly et al.
… stages of scale-up. The high costs make gathering as much knowledge as possible from each test vital. The TRL 6 deployment of the Ocean Energy OE35 buoy, with the Siemens HydroAir Turbine at the US Navy Wave Energy Test Site (WETS) in Kāne‘ohe Bay, O’ahu, Hawai’i is the largest floating oscillating water columns …
- Journal Article:
Walker et al.
… In order to fully utilise test sites, marine energy device developers must be able to deploy, maintain and decommission … a cost effective manner. Critical to this is the knowledge of the metocean conditions at the site and the weather window availability, particularly when this is coupled with vessel … The method discussed has been applied in a case study for the South West of England using site specific environmental parameters and empirical expressions to calculate the accessible …
- Report:
European Marine Energy Centre (EMEC)
… upon the lessons learnt from real sea deployments of marine renewables at the Orkney-based test site. Four guidance documents have been produced, covering Compliance, Handling, Installation, …
- Journal Article:
Mattiazzo
… concepts have been developed and some of them tested in full scale. The most recurrent test environment is the North Atlantic Ocean, which possesses high energy potential. The … Readiness Level (TRL) 7. The article will document the deployment and the following open sea test campaign of a full scale prototype off the shore of Pantelleria Island, Italy. … …
- Report:
European Marine Energy Centre (EMEC)
… upon the lessons learnt from real sea deployments of marine renewables at the Orkney-based test site. Four guidance documents have been produced, covering Compliance, Handling, Installation, …
- Report:
WavePiston
The project covers a demonstration of the Wavepiston wave energy concept. Numerical tools for estimation of structural design loads and absorbed power for the concept were developed, together with a tool to model the motion of the complete string structure. A 1:2 scale installation was designed, built and installed in the North Sea. With several iterations made on the detailed design during…
- Report:
European Marine Energy Centre (EMEC)
… upon the lessons learnt from real sea deployments of marine renewables at the Orkney-based test site. Four guidance documents have been produced, covering Compliance, Handling, Installation, …
- Journal Article:
Niebuhr et al.
… exists for zero-head technologies. Careful selection of an optimal hydrokinetic installation site is a critical challenge. Hydrokinetic development phase enhancement measures allow an …
- Presentation:
Bassett
… R/V Russell Davis Light was moored in Agate Pass, Washington, to perform the first saltwater test of a university-developed tidal turbine designed for sustained deployment as a bottom lander … and tracking of targets with the acoustic and optical cameras. Topics including planning, site selection, mooring design, operations/logistics, personnel requirement, and costs inform a … particular note are the contributions of three additional people without whom the Agate Pass test would not have been successful: Jesse Dosher (software), Paul Gibbs (mechanical design …
- Conference Paper:
Whittaker et al.
… Oyster module has been designed and it is planned to install a prototype module at the EMEC test site in Orkney when the nearshore test berth is available. In this version of Oyster high pressure sea water will be pumped ashore …
- Report:
European Marine Energy Centre (EMEC)
… upon the lessons learnt from real sea deployments of marine renewables at the Orkney-based test site. Four guidance documents have been produced, covering Compliance, Handling, Installation, …
- Conference Paper:
Mann et al.
… in-sea device testing program. CETO market development in Australia is proceeding with site identification and detailed discussions with major stakeholders. This is viewed as an …